MAJOR PROJECTS EXECUTED For many years, REMY Sp. z o.o. has been executing, as an independent contractor or joint contractor, complex overhauls and investment projects for the heavy industry. Our participation in the project "Construction of the exhaust gas cleaning plant for anodic rotary and stationary furnaces of 'Głogów II' Copper Smelter" contributed to receiving an award for the whole project in the contest "Construction of the year 2003" organized by the Polish Association of Civil Engineers and Technicians. The major projects executed by the Company include, among others:
|
|||
| "Głogów" Copper Smelter | Overhaul of concentrate dryer. | 1998 |
|
| "Głogów" Copper Smelter | Overhaul of DORRA settling tanks. | 1998 |
|
| "Głogów" Copper Smelter | Dismantling of drying and absorption system in Sulphuric Acid Division. | 1999 |
|
| SVEDALA POLSKA | Installation of pressure filter. | 1999 |
|
| "Głogów" Copper Smelter | Servicing of switchgear, transformers and automatic control systems. | 2000 |
|
| "Głogów" Copper Smelter | Services in scope of tank structure overhaul and application of chemical resistant coating to tank surface using plastic (PP, PVDF, PFA, ECTFE) bonding technology. | 2000 |
|
| "Głogów" Copper Smelter | Servicing of external lighting of yards and roads. | 2000 |
|
| URBEX | Construction of sanitary sewerage system for Szczytniki village. | 2000 |
|
| AKPOL | Construction of lighting for Customs Clearance Yard at "Głogów" Copper Smelter. | 2000 |
|
| DISA | Installation of cassette filters with COMBIFAB ventilators. | 2001 |
|
| AMK KRAKÓW SA | Gas extraction and cleaning plant for new anodic rotary furnaces and for existing stationary furnace. | 2001 |
|
| AMK KRAKÓW SA | Gas extraction and cleaning plant for tilting rotary furnaces at Lead Division of "Głogów" Copper Smelter. | 2001 |
|
| SCHRAGE | Installation of pipe and chain conveyors. | 2001 |
|
| "Głogów" Copper Smelter | Construction of gas extraction and cleaning plant for anodic rotary furnaces no. 1 and no. 2, and anodic stationary furnaces no. 4 and no. 5. | 2002 |
|
| AMK KRAKÓW SA | Construction of discharge gas cleaning plant for anodic rotary and stationary furnaces at "Głogów" Copper Smelter. | 2003 |
|
| "Głogów" Copper Smelter | Installation and start-up of anode preparation machine. | 2003 |
|
| "Głogów" Copper Smelter | Installation for removing NOx from sulphuric acid. | 2004 |
|
| "Głogów" Copper Smelter | Lining and mechanical and structural works on fire objects. |
2004 |
|
| AMK KRAKÓW SA | Metallurgical Department - Dust extraction from gases for anodic furnaces at "Legnica" Copper Smelter. | 2004 |
|
| ZUW URBEX | Crushed Ore Storage along with construction of belt conveyor trestle at "Rudna" Mining Plant. | 2004 |
|
| "Głogów" Copper Smelter | General overhaul of Kp-6 Steam Boiler at Heat and Power Generating Division. | 2004 |
|
| "Legnica" Copper Smelter | Installation of SOLINOX system for waste gas dechlorination and cooling. | 2004 | |
| "Głogów" Copper Smelter | P-7 - Increasing of Tank House production capacity - transformer stations at OE-I and OE-II, and reconstruction of transformer stations no. 1-7. | 2004 |
|
| "Cedynia" Copper Smelter | Modernization of Asarco furnace loading zone. | 2004 |
|
| "Głogów" Copper Smelter | Overhaul and modernization of fluidised-bed furnace. | 2005 |
|
| "Głogów" Copper Smelter | Installation of SFO14 compressor. | 2005 |
|
| "Głogów" Copper Smelter | Overhaul of waste-heat boiler. | 2005 | |
| "Głogów" Copper Smelter | Construction of gas cooling station (station 100). | 2005 |
|
| "Głogów" Copper Smelter | Manufacture of forming rings for bricketting presses. | 2005 |
|
| "Legnica" Copper Smelter | Overhaul of converters. | 2005 |
|
| "Głogów" Copper Smelter | Modernization of circulation in absorption tower and drying tower of Sulphuric Acid Plant. | 2005 | |
| "Cedynia" Copper Smelter | Construction of foundations and structure of production building along with foundations for oxygen-free copper rod production line. | 2005 |
|
| ZWR | Modernization of switchgear supply. | 2006 |
|
ZWR |
Modernization of dust removing equipment set at crushing plant. | 2006 |
|
"Głogów" Copper Smelter |
Prefabrication and installation of heat exchangers E201 and E202. | 2006 |
|
"Głogów" Copper Smelter |
Installation and start-up of carousel casting machine. | 2006 |
|
BIPROMET |
Dust removing and gas desulphurisation installation for fluidised-bed furnace. |
2006 |
|
| BIPROMET | Construction of the post-neutralization sludge dewatering and filtration facility in HMG. | 2006 | |
| KGHM ECOREN | Modernization of the Sludge Filtration Building and modernization of rooms in the Administration and Social Building. | 2006 | |
| "Głogów" Copper Smelter | Construction and mechanical and process commissioning of LURGI BISCHOFF GmbH wet electrostatic precipitator assembly along with accompanying sulphuric acid plant systems and equipment of HMG Department P-6. | 2007 | |
| KGHM ECOREN | Construction and installation works at the rhenium eluate production plant along with mechanical commissioning. | 2007 | |