MAJOR PROJECTS EXECUTED

For many years, REMY Sp. z o.o. has been executing, as an independent contractor or joint contractor, complex overhauls and investment projects for the heavy industry. Our participation in the project "Construction of the exhaust gas cleaning plant for anodic rotary and stationary furnaces of 'Głogów II' Copper Smelter" contributed to receiving an award for the whole project in the contest "Construction of the year 2003" organized by the Polish Association of Civil Engineers and Technicians.

The major projects executed by the Company include, among others:

 

"Głogów" Copper Smelter
Overhaul of concentrate dryer.
1998
"Głogów" Copper Smelter
Overhaul of DORRA settling tanks.
1998
"Głogów" Copper Smelter
Dismantling of drying and absorption system in Sulphuric Acid Division.
1999
SVEDALA POLSKA
Installation of pressure filter.
1999
"Głogów" Copper Smelter
Servicing of switchgear, transformers and automatic control systems.
2000
"Głogów" Copper Smelter
Services in scope of tank structure overhaul and application of chemical resistant coating to tank surface using plastic (PP, PVDF, PFA, ECTFE) bonding technology.
2000
"Głogów" Copper Smelter
Servicing of external lighting of yards and roads.
2000
URBEX
Construction of sanitary sewerage system for Szczytniki village.
2000
AKPOL
Construction of lighting for Customs Clearance Yard at "Głogów" Copper Smelter.
2000
DISA
Installation of cassette filters with COMBIFAB ventilators.
2001
AMK KRAKÓW SA
Gas extraction and cleaning plant for new anodic rotary furnaces and for existing stationary furnace.
2001
AMK KRAKÓW SA
Gas extraction and cleaning plant for tilting rotary furnaces at Lead Division of "Głogów" Copper Smelter.
2001
SCHRAGE
Installation of pipe and chain conveyors.
2001
"Głogów" Copper Smelter
Construction of gas extraction and cleaning plant for anodic rotary furnaces no. 1 and no. 2, and anodic stationary furnaces no. 4 and no. 5.
2002
AMK KRAKÓW SA
Construction of discharge gas cleaning plant for anodic rotary and stationary furnaces at "Głogów" Copper Smelter.
2003
"Głogów" Copper Smelter
Installation and start-up of anode preparation machine.
2003
"Głogów" Copper Smelter
Installation for removing NOx from sulphuric acid.
2004
"Głogów" Copper Smelter
Lining and mechanical and structural works on fire objects.
2004
AMK KRAKÓW SA
Metallurgical Department - Dust extraction from gases for anodic furnaces at "Legnica" Copper Smelter.
2004
ZUW URBEX
Crushed Ore Storage along with construction of belt conveyor trestle at "Rudna" Mining Plant.
2004
"Głogów" Copper Smelter
General overhaul of Kp-6 Steam Boiler at Heat and Power Generating Division.
2004
"Legnica" Copper Smelter
Solinox
Installation of SOLINOX system for waste gas dechlorination and cooling. 2004
"Głogów" Copper Smelter
P-7 - Increasing of Tank House production capacity - transformer stations at OE-I and OE-II, and reconstruction of transformer stations no. 1-7.
2004
"Cedynia" Copper Smelter
Modernization of Asarco furnace loading zone.
2004
"Głogów" Copper Smelter
Overhaul and modernization of fluidised-bed furnace.
2005
"Głogów" Copper Smelter
Installation of SFO14 compressor.
2005
"Głogów" Copper Smelter
Overhaul of waste-heat boiler. 2005
"Głogów" Copper Smelter
Construction of gas cooling station (station 100).
2005
"Głogów" Copper Smelter
Manufacture of forming rings for bricketting presses.
2005
"Legnica" Copper Smelter
Overhaul of converters.
2005
"Głogów" Copper Smelter
Modernization of circulation in absorption tower and drying tower of Sulphuric Acid Plant. 2005
"Cedynia" Copper Smelter
Construction of foundations and structure of production building along with foundations for oxygen-free copper rod production line.
2005
ZWR
Modernization of switchgear supply.
2006
ZWR
Modernization of dust removing equipment set at crushing plant.
2006
"Głogów" Copper Smelter
Prefabrication and installation of heat exchangers E201 and E202.
2006
"Głogów" Copper Smelter
HMG P24
Installation and start-up of carousel casting machine.
2006
BIPROMET
Dust removing and gas desulphurisation installation for fluidised-bed furnace.
2006
BIPROMET
Construction of the post-neutralization sludge dewatering and filtration facility in HMG. 2006
KGHM ECOREN
Modernization of the Sludge Filtration Building and modernization of rooms in the Administration and Social Building. 2006
"Głogów" Copper Smelter
Construction and mechanical and process commissioning of LURGI BISCHOFF GmbH wet electrostatic precipitator assembly along with accompanying sulphuric acid plant systems and equipment of HMG Department P-6. 2007
KGHM ECOREN
Construction and installation works at the rhenium eluate production plant along with mechanical commissioning. 2007