Modernization of the Sludge Filtration Building and modernization of rooms in the Administration and Social Building. :
Sludge Filtration Building:
engineering and construction works within an extensive modernization of the building:
- reconstruction of ceilings,
- construction of the external facade,
- roof repair and gutter installation,
- renewal of the door and window woodwork,
- installation of the lightning protection system,
- finishing works in the rooms,
installation of the lighting and power supply system,
installation of the equipotential bonding system,
installation of the water supply, sewage and central heating systems,
installation of the ventilation system.
Administration and Social Building:
construction works associated with the rearrangement of rooms on two floors of the three- story building,
renewal of the door and window woodwork,
finishing works in the rooms, including wall and floor cladding with acid-proof materials,
installation of the water supply and sewage systems,
installation of the power supply system along with all required testing,
installation of the ventilation system,
installation of the goods lift.
|
|