Construction and installation works at the rhenium eluate production plant along with mechanical commissioning:

The works were executed between December 2006 and March 2007, and their scope included:
• general construction works,
• Kolbet slab protecting works,
• construction of the plant support structure,
• installation of connecting systems:
  - installation of control wiring system and automatic control and measuring apparatus,
  - installation of power system,
  - installation of compressed air system,
  - installation of steam system,
• installation of the plant for rhenium eluate production
• execution of process commissioning of the plant.